Organization/Company

Webuild S.p.A

Project Title

4D Modeling and Construction Management for Steel Bridge Construction in the New ENI HQ

Lieu
San Donato Milanese, Lombardia to Milano, Italy
Logiciel utilisé 

SYNCHRO

Image Credit: Webuild s.p.a.
Résumé du projet

Set to become one of the world’s most innovate sustainable developments, Milan’s new, iconic ENI headquarters features three interconnected office buildings, a landmark skybridge, and 11,684 square meters of total green surface area. Webuild was contracted to deliver the project over a short timeline amid a limited footprint. However, the critical node of the entire construction plan was the large steel sky bridge, presenting a complex assembly. To keep the project on schedule and ensure safe, streamlined workflows, Webuild needed a collaborative digital construction simulation solution.

Webuild selected SYNCHRO to establish a dynamic, virtual construction environment and a digital twin to evaluate multiple scenarios, perform clash detection, and determine a construction solution that optimized planning and safety while minimizing social and environmental impact. Bentley’s 4D construction technology reduced rework by 90% and the construction schedule from 85 days to just four days. Working in a connected digital platform optimized site layout, decreasing the carbon footprint of the project by 30%, and provided insight into all phases of construction, achieving zero on-site accidents.

Digital rendering of a construction site with partially built structures and cranes. The image shows different buildings, cranes, and scaffolding, indicating ongoing construction activities.

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.