Accueil / Application of Intelligent Construction Technology in the Construction of Comprehensive Improvement Project for the Outlet Reach of Fuhuan River
Organization/Company

China First Metallurgical Group Co., Ltd.

Project Title

Application of Intelligent Construction Technology in the Construction of Comprehensive Improvement Project for the Outlet Reach of Fuhuan River

Lieu
Wuhan, Huebei, China
Logiciel utilisé 

iTwin Capturer

Image Credit: China First Metallurgical Group Co., Ltd.
Résumé du projet

This water conservancy initiative will improve flood control capacity and the ecological environment of Changjiang New Town in Wuhan. The project presented complex terrain and strict environmental requirements, compounded by coordinating voluminous data and multiple stakeholders. Having tried several software applications to process and model the terrain data, the project team realized that they lacked the features and interoperability required to meet modeling accuracy and workflow efficiencies. The engineering firm needed a comprehensive data capture and modeling solution that supported collaboration, design, and construction. 

The team selected iTwin Capture to create a refined 3D terrain model from aerial images and analyze excavation and construction works. Bentley’s application delivered accurate modeling results and facilitated real-time information sharing, streamlining workflows to improve design precision by 30% and shorten the design cycle by 15 days. Through digital simulations, they optimized the construction scheme, reducing earthworks by 10% to minimize carbon emissions, while saving 25 days and CNY 550,000 during the construction period. The collaborative digital solution lays a solid foundation for sustainable development of the project.

Aerial view of a small town with rows of greenhouses, residential buildings, and a large cleared area with rubble. Surrounding greenery and hills are visible.

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.