Accueil / North East Link Central Package 
Organization/Company

Spark and WSP

Project Title

North East Link Central Package 

Lieu
Melbourne, Victoria, Australie
Logiciel utilisé 

GeoStudio, Leapfrog, OpenRoads, PLAXIS, ProjectWise

Image Credit: Spark and WSP
Résumé du projet

Victoria’s largest infrastructure project, the North East Link will improve connectivity in Melbourne’s freeway network, removing 15,000 trucks from congested roads. Successful delivery of the project required Spark’s engineering design team to bring in seven design consultancies, including WSP, who is responsible for modeling and communicating the complex geological site conditions and risks. To rapidly model, capture, visualize, and integrate the voluminous ground engineering data for multidisciplinary design evaluation, the team needed flexible, comprehensive geotechnical software and a connected data environment.  

Using Leapfrog, PLAXIS, and ProjectWise, WSP developed, refined, and delivered 3D subsurface models that were integrated into the federated project model for design analysis and construction planning. Working in a connected digital platform streamlined workflows, saving 1,500 hours in collaborative modeling. Through comprehensive geotechnical modeling, the team optimized risk management and design compliance, saving AUD 6 million, and were able to recycle excavation materials, saving an additional AUD 10 million. The 3D geological models will be incorporated into the digital twin to support tunnel operation and emergency management.

Abstract image with a dark blue background featuring a winding, multicolored path dotted with various geometric shapes and lines.

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.